About Us

iTopPlus594808889769
iTopPlus1237840847692
iTopPlus302211182412

TRAD GROUP OF COMPANIES
TRAD GROUP OF COMPANIES consists of

  • Trad Construction Ltd. Part., founded in 1984
  • Trad International Golf Service Co., Ltd., founded in 1991
  • Trad Karnyota (2002) Co., Ltd., founded in 1997

CORPORATE PROFILE
TRAD GROUP OF COMPANIES was founded on 12 April 1984. From the beginning, we worked on various kinds of civil works includes road construction, dike for flood protection, overburden for marl mining, lake dredging, water reservoir with earth dike and earth-core dam, open zoo earthwork.
Our works as a general contractor that has been completed includes various golf course projects. The most outstanding one was Winsan Golf Club Project, Bangkok (The Legacy). This project was to develop and construct an 18-hole golf course. The golf course was designed by Jack Nicklaus, a renowned golfer and golf course designer.
iTopPlus937519453137

iTopPlus1120741641065

In 1996, with our previous excellent experience, we were chosen by KhaoYai Natural Park Co., Ltd. to be a contractor to construct The Country Club KhaoYai (Kirimaya Golf Club), another 18-hole golf course designed by Jack Nicklaus.
In 1998, we were awarded the contract for a construction of a Controlled (Polder) Flood Protection System, Package II – Main Polder & Pump Station for New Bangkok International Airport Co., Ltd. (NBIA) at the total contract price of 493,211,143.70 Baht. This is currently part of Suvarnabhumi Airport.

We are proud of our past activities, background and glorious successes in building many international-standard golf courses.
iTopPlus22505870451

Building golf courses require specialised skills, experiences and knowledge regarding modern implements as well as great responsibility. These are our company’s standards.

TRAD GROUP OF COMPANIES is equipped with more than 200 items of different kinds of modern and efficient equipment, and also a capable team of staff in charge.
iTopPlus779362254910

Scope of work for golf course construction
Mobilization - Mobilize the equipment into the site for the construction work and remove them from the site after a completion of work.
Site office and labor camp installation - Installation of site office and labor camp for the construction, completes with computer and internet access.
Site Clearing - Clearing of vegetation as required to prepare the site for the construction.
Remove unsuitable material - Remove all unused material and/or material which needed to be replaced.
Staking and Survey - Provide location of tees, fairway bunkers, turning points in fairway landing area and centres of green location.
Cut & Fill - Bulk and rough earthmoving of major earthwork within and between individual golf holes for execution of the shaping work.
Rough Shaping - Contour shaping of fairway and rough land form development. Rough shaping illustrates tee locations, green locations, fairway bunker locations, and cart path locations.
Fine Shaping - Detailed shaping of tees, fairway bunkers and greens by golf course shaping specialists. 
Drainage & Storm Drainage - Installation of storm drainage pipes and drain inlets/manhole structures. Subsurface drainage development, including perforated drain lines installation.
Greens - Detailed work on greens for additional contour, installation of drain inlets along with storm drainage pipes, subsurface drainage pipes and turf grass planting.
Bunkers - Detailed work on bunkers for additional contour, installation of drain inlets and sand bedding.
Tees - Detailed work on tees for additional contour, installation of drain inlets along with storm drainage pipes, subsurface drainage pipes and turf grass planting.
Fairways - Detailed work on fairway sand bedding along with contour, turf grass planting with 100% weed free Zoysia Matralla. 
Turf grass Planting – Plant turf grass for greens (Tif Eagle), tees (Zoysia Matralla), fairways, maintained roughs and non-maintained areas. Selection of the turf grass species is provided as client requests.
Cart Path - Construction of cart paths following the client’s layout and specification.
New Driving Range - Construction of a new driving range with target greens following the client’s design, including automatic irrigation system and drainage.
Remark : All construction materials shall be approved by owner before installation.

Golf course projects that Trad have been involved in include
• Winsan Golf Club (Legacy Golf Club), Thailand - 18 Holes
• Green Valley Golf Club, Thailand – 18 Holes
• The Country Club Khao Yai (Kirimaya Golf Club), Thailand - 18 Holes
• Panya Indra, Thailand - 27 Holes
• Panya Hill (Mountain Shadow), Thailand - 18 Holes
• Panya Park, Thailand - 27 Holes
• Andaman Club Golf Resort and Casino, Myanmar - 18 Holes
• EGAT Mae Moh Mine Golf Course, Thailand - Remodel Bunkers
• Lamlukka Golf Club, Thailand - 9 Holes
• Lake Hills & Country Club, Thailand - 18 Holes
• Imperial Lake View Hotel & Golf Club, Thailand - 9 Holes
• Pattana Sport Club, Thailand – Remodel Fairways
• Etc.

iTopPlus499217606080

Our President
Mr. Songchai Wattanachai

[[POS3]]

Designer

iTopPlus135026945639

iTopPlus22164760943

iTopPlus382558443753

iTopPlus892538203871

iTopPlus505471669861

iTopPlus288699749125

iTopPlus772746911718

iTopPlus301494536687

iTopPlus1294368063474

iTopPlus1336963587714

Our Clients

iTopPlus384085496943

iTopPlus444449274244

iTopPlus447501987939

iTopPlus1114196748396

iTopPlus34725760446

Downloads